Address

Saint-Gobain Malaysia Sdn. Bhd.
No. 1, Jalan Sultan Mohamad 4
Kawasan Perindustrian Bandar Sultan Suleiman
42000 Port Klang, Selangor Darul Ehsan
Malaysia.
Email: Solutions.MY@saint-gobain.com

Elmina West Elmina Valley Phase 3A (EV 3A)

City of Elmina, Selangor

Elmina Valley Phase 3 (EV3), the third phase of Elmina West in the City of Elmina township. EV3 is divided into two parts, namely EV3A and EV3B. EV3A and EV3B consist of 203 and 151 units of double-storey linked houses, respectively. The freehold development has built-ups ranging from 2,626 sq ft to 3,030 sq ft.

Outcome

Gyproc proposed the following products:

  • 9mm TopLine®
  • 9mm AquaLine®

Project information

Client

Sime Darby Property Bhd

Main contractor

Jallcon (M) Sdn Bhd

Contractors

FDC Contract Sdn. Bhd.

Architect

Visage Architect

Sectors


Systems and solutions used in this project